SPIRIT VALLEY BUSINESS PARK - PHASE 2
Spirit Valley Business Park is expanding. This summer, Keystone Construction Company will begin construction of the roads and utilities to deliver the final expansion of this 80 acre office/industrial business park in Chesterfield Valley. Keystone built the first phase of the park in 2007 and has built 11 buildings for a variety of companies including Chesterfield Fence & Deck, Vermeer Equipment and Neff Power. Phase II is set for completion by December 2024.
TUBULAR USA IN CHESTERFIELD, MISSOURI
Tubular USA will be relocating their headquarters into Spirit Valley Business Park located in Chesterfield, Missouri. Tubular USA is one of the nation’s largest suppliers of galvanized tubular products, along with other steel solutions. Keystone Construction Company is looking forward to building this 140,000sf facility specifically designed to the needs of Tubular USA.
Tubular (earthcam.net) Live site camera
https://share.earthcam.net/tJ90CoLmq7TzrY396Yd88MRKzeUI0adXRq2CAoOVP_M!/tubular/tubular_3/live
SOURCEONE SOLUTIONS IN ST. CHARLES COUNTY
Keystone Construction is working with SourceOne Solutions to build their new headquarters and distribution facility in St. Charles County. SourceOne provides commercial lighting, graphics, signage, security equipment, and various other electrical products.
MiTEK 52,000 sq ft EXPANSION IN ST. CHARLES, MISSOURI
Continued growth has led to the expansion of MiTek's St. Charles, Missouri industrial facility. Completion is scheduled for November of 2022.
52,000 sq ft expansion to MiTek's existing manufacturing facility
Tilt-up concrete construction
Two 20 ton Bridge Cranes
Four 10 ton Bridge Cranes
80' wide structural column spacing
30' minimum clear height
Two semi-trailer truck drive thru lanes inside the expansion
KMOV IN ST. LOUIS, MISSOURI
A new corporate headquarters and television studios is in the future for KMOV. The project is slated for a fall 2023 completion.
THE HUB AT THE DISTRICT IN CHESTERFIELD, MISSOURI
The Hub-- an outdoor hangout inclusive of a stage, large LED screens and plenty of seating options. This area will be backed by a local brewery and flanked by iconic restaurants, all of which will have outdoor patios facing inward towards this great space! In no time at all you'll be out here with your friends and family!
Check out the photos below of the teardown before the big build up of The Hub!
THE DISTRICT IN CHESTERFIELD, MISSOURI
A premier entertainment development. Featuring live music, restaurants and gaming concepts.
See demolition and construction here:
Click the link and see Main Event @ The District project work here:
https://public.earthcam.net/tJ90CoLmq7TzrY396Yd88DB15PRIR_KSrRd7gat6Q9g
See The Factory build here: https://lnkd.in/gSUuHfV
See The Factory interior build here: https://app.truelook.com/?m=15928146338209537574225
SPEC OFFICE, WAREHOUSE CONDO IN CHESTERFIELD, MISSOURI
Keystone has begun construction on 40,000 square feet of flex space in Chesterfield, Missouri available for sale or lease in 10,000 square foot increments.
See more: https://lnkd.in/gAKBt-cg contact Dan Hayes
at NAI DESCO
MiTEK - WESTAMPTON, NEW JERSEY
With locations all over the globe MiTek engaged Keystone for a major renovation of their Westampton, New Jersey facility.
HOW TILT-UP PANELS ARE ERECTED
Did you ever wonder how buildings are constructed with concrete tilt-up panels? Keystone will be using one of its latest projects in Chesterfield, MO as a "teaching course". The panels are formed, rebar installed and concrete poured directly on the building floor slab. Each panel weighs approximately 48,000 pounds. On this project a 150 ton lattice-boom crane will raise and place each of the 45 panels into position taking 4 days to complete.
HOW TILT-UP PANELS ARE ERECTED
Go to Youtube and watch one of the tilt-up panels being lifted and placed on our latest building.